Wellington Suspension Bridge, Aberdeen, Scotland

Elements area

Taxonomy

Code

Scope note(s)

  • Cast and wrought ironwork designed by Samuel Brown (1776-1852) with John Tudor Smith (architect) and James Abernethy (engineer/contractor). Built to connect Ferryhill to Craiglug, 1829-1831. Opened to traffic in May 1831. Cost £10,000. Ironwork replaced by steel in 1930 and bridge restored in 2008.

Source note(s)

  • See National Record of the Historic Environment, <https://canmore.org.uk/>.

Display note(s)

    Hierarchical terms

    Wellington Suspension Bridge, Aberdeen, Scotland

      Equivalent terms

      Wellington Suspension Bridge, Aberdeen, Scotland

      • UF Wellington Chain Bridge

      Associated terms

      Wellington Suspension Bridge, Aberdeen, Scotland

        1 Archival description results for Wellington Suspension Bridge, Aberdeen, Scotland

        1 results directly related Exclude narrower terms