Zone d'identification
Cote
Titre
Date(s)
- 15 December 1883 (Production)
Niveau de description
Étendue matérielle et support
1 item
Zone du contexte
Nom du producteur
Notice biographique
Thomas Airey was the resident engineer to Clifton Suspension Bridge during its construction, 1861-1864, and worked as a consultant engineer for the bridge in the years afterwards, at which point he appears to be living and working at times abroad. Civil engineer lists record that he was Breslan and at Aird's in Danzig (Netherlands) and at Monk Heseldon, Castle Eden Coliery Co., Durham in 1873 and in 1878 in Stockport.
Histoire archivistique
Source immédiate d'acquisition ou de transfert
Zone du contenu et de la structure
Portée et contenu
Airey's report of the examination of the bridge on 19 and 20 September 1883, principally concerning the state of the decking and recommending that the top of the deck be replaced with English glen timber and covered with tar and asphalt.
Évaluation, élimination et calendrier de conservation
Accroissements
Mode de classement
Zone des conditions d'accès et d'utilisation
Conditions d’accès
Conditions de reproduction
Langue des documents
Écriture des documents
Notes de langue et graphie
Caractéristiques matérielle et contraintes techniques
Instruments de recherche
Listed as BM92a in 'Archives in Bridgemaster's Office' by Gill Blakeman and Hannah Lowery, January 2003.